Installation Design

Since the launch in 2003, the revolutionary Maxsys Fuel System has been successfully installed at plants owned by some of world’s most energy intensive businesses, operating across a wide range of industries.

Below are typical installations in 3D produced by the Design to Save Team.

A Maxsys Fuel System is installed onto the 400 kwh burner of a dryer running on gas.

Maxsys Fuel System is fitted onto a Babcock & Wilcox steam raising boiler with Low NOx burner running on gas.